External repairs and restoration works, carried out as a part of the Country Clubs’ Cyclical Repairs/Maintenance Program.
The wall of the building was fully scaffold with a walkway onto the flat roof from the rear door. Masonry repairs carried out including Helifix crack stitching. The defective windows and doors were repaired or replaced. Full redecoration of external surfaces. Flat roof repaired, pitch roof slating overhauled.
Project commenced and was completed on time. We have been advised that ur company will be invited to tender for the next phase of the maintenance program shortly.